Transcript
AGS One 178/179 Cannon Workshops, Cannon Drive, Hertsmere
Road, London E14 4AS Customer DEPOT - UPMINSTER (ABM) Helpdesk Address Job type ABM - LUL Pest Control - Routine Order number 213168 13/03/2026 08:00 - 09:00 Road London Heathrow Airport Dniving duration 00:00:01
AGS
ONE
Resource
ABM Pest ABM Pest ABM Pest Assisted by
Contact
Cull
Reference PC/ABM/PMC0054-023
Date
Billing address ABM UK
World Business Centre 3, Newall
Job duration
01:0:0
Hounslow
TW6 2TA
0 mi
Distance travelled
Answer Notes
AGS - Pre-shoot Checklist
Have The Police Been No Notified?
Has the customer and any
Yes
other contractors/people on
site not involved in the shoot,
been excluded from the area
where shoot is taking place?
Do all participating staff
Yes
understand the procedures
for the proposed shoot and
have the appropriate PPE and
paperwork to complete the
work?
BigShange
We are ONE for a reason!
| Has the customer and any | Yes | |---|---| | other contractors/people on | | | site not involved in the shoot, | | | been excluded from the area | | | where shoot is taking place? | | | Do all participating staff | Yes | | understand the procedures | | | for the proposed shoot and | | | have the appropriate PPE and | | | paperwork to complete the | | | work? | |
Can the shoot be done safely Yes without affecting or being affected by, other site activities, neighbouring sites, buildings, other premises, houses, open areas and public spaces?
Before refilling the reservoir Yes on compressed air powered air rifles, have you completed a pre-use visual check on the oxygen refill cylinder?
Can the shoot be done Yes without endangering non-target animal, protected species (e.g. bats), livestock, other wildlife, trees and vegetation?
Have arrangements been Yes made for the proper disposal of pest bird bodies?
Are the weather and lighting Yes conditions safe for the shoot
to proceed? Shoot to proceed? Yes Name of Lead Tech Lead Tech Signature
AGS One 178/179 Cannon Workshops, Cannon Drive, Hertsmere Road, London E144AS
AGS
ONE
AGS/MITIE POWRA
Answer Notes
Do you have an in date first Yes aid kit and eye wash on site?
Are you moving any Yes equipment or materials using a lift or escalator?
Have you read and Yes understood the Risk Assessment and Method Statement for these works, and can the works be completed safely in accordance with them?
We are ONE for a reason!
BigShange operatives
wearing
they
date, correctly calibrated and
equipment
to
bring you
material?
| | AGS One | |---|---| | | 178/179 Cannon Workshops, Cannon Drive, Hertsmere | | | Road, | | | London | | | E14 4AS | | Identify how you will be | Not Applicable | | securing your work site | | | Are all team | Yes | | trained and certified for the | | | tasks they are undertaking? | | | Are all team members | Yes | | the correct PPE in | | | line with the method | | | statement for the tasks | | | will be undertaking? | | | Will any of the following be | None | | affected by the works? | | | If required, do you have in | Yes | | tested for the | | | task? | | | Does the task require you have a spill kit on site? | No | | Is there any aspect of these | No | | works that will or | | | the team into contact with asbestos containing | | | Does the task involve at height (including working | No | | open access chambers)? | | | Will you be using a power | No | | a HAVS assessment? | | | Have all hazards been | Yes | | removed to an acceptable | | | level at this site to allow | | | works to safely continue? | | | Do you require any resources to protect the | No | | environment at this site? | | | Will the noise created by part of the works affect | No | | site personnel, other | | | contractors, client staff or | | | members of the | | | (including the stations | | | neighbours)? | | | Are there any additional | No | | comments or notes about | | | these works? | | | | We are ONE for a reason! |
working
on stairs, landings, and over
tool such as drill that require
additional
any
any
public culled?
that
cull?
to
cull?
| | AGS One | |---|---| | | 178/179 Cannon Workshops, Cannon Drive, Hertsmere | | | Road, | | | London | | | E14 4AS | | Pest Control - Report | | | | Answer Notes | | Number of Pigeons | 32 | | Number of shots fired on | 40 | | target during cull? | | | Number of shots fired missed target during | 0 | | Was any damage caused the premises during the | No | | Photo 1 | | | Pest Species Active | Feral pigeon (Columba livia) | | Location | Internal | | Level of Activity | High | | Work | On cull we have been | | | a cull inside the | | | shed this has resulted in a | | | total of 32 | | | and culled | | | and removed. | | Recommendations | Please refer to the sales page | | | about the where a | | Housekeeping/ Hygiene) | solution has been suggested. | | Recommendations Proofing/ Structural) | Please refer to the sales lead where a suggestion has been | | | put in place for a replacement | | | net to be installed. | | Recommendations | None | | Product Used: | No products used | | | We are ONE for a reason! |
Report: today's
doing cleaning
pigeons
successfully safely
(Environmental/ hygiene
(Fabric/
(Other)
AGS One
178/179 Cannon Workshops, Cannon Drive, Hertsmere
Road,
London
E14 4AS
Post Work Photo 1
We are ONE for a reason!
This transcript was generated automatically and may contain errors. Refer to the original document for the exact wording.